4 rebar 4 9 long.
Tibe stell mounted to top of cmu wall.
Product data sheet sds hot dip leed purchase online.
Pvc pipe s cast into wall 1 2 diameter bolt with washer 3 min.
You take a 2 steel post and sink it into the wall.
Electric conduit bender photo 5 is the only specialty tool you need to bend 10 ft.
All steel will have 1 1 2 of concrete cover.
Aisc hss pipe round 1 1 4 schd 40 2x2x3 16 1 1 2 schd 40 top rail posts kneerail max riser stringer type flat plate 1 4 3 8 channel types mc12x10 6 c12x20 7 12 typ.
Ties masonry to masonry for structural load bearing non structural intersecting cmu walls.
Tread types concrete pan smooth plate diamond tread precast open riser precast closed riser bar grating pg 1 1 pg 1 2 pg 1 3 pg 1 4 handrail type pipe 1.
From top of wall 6 pvc pipe filled with concrete or fiberglass post insulator attached to post notes 1.
Then you attach an accessory called an ez bracket to the top and the bottom of the steel post.
They can be used in concrete block and brick.
There are three different ways to install a vinyl fence on top of a wall.
Both hex head and phillips head styles are available.
Spaced 2 apart tie to horizontal.
This is the most sturdy method.
Window sill detail anchored brick veneer cmu backing 01 030 0501.
Water pipe which serves as the handle and screws into the bender head photo 5.
Unsupported brick return at jamb.
Base of wall detail anchored brick veneer cmu backing cmu foundation 01 030 0402.
Concrete screws come in 3 16 and 1 4 inch diameter in lengths up to 3 3 4 inches.
A variety of example details are available here ranging from customizable details to illustrative examples addressing many situations for concrete masonry structures.
You don t drop the entire 4 x4 or 5 x5 post into the wall with this method.
To attach your railing to concrete you will need a hammer drill to drill into the concrete a standard drill for drilling into the pipe an allen wrench to tighten the fittings a hammer a tape measure hack saw vacuum extension cord and a sharpie marker.
Of course all generic details must be modified to the specifics of your project and approved by an architect or engineer prior to use for construction.
Attaching the railing to a concrete base.
Franklin road meridian id 83642 5902 phone.