Then follow the instructions to install and secure the tub.
Tile tub surround installation.
For a tub surround only install the backerboard and tile 12 inches above the tub.
Use level and plumb lines to guide the installation.
The old tile area needs to be smaller than the kit and you ll need to build up the surrounding wall.
When tiling around a tub mark the first layout line at the vertical edge of the tile next to the tub.
The walls on top of the tub surround need to be caulked and waterproofed before you.
I cover some of the specifics of how to layout and set up a tub to install tile around it.
Bathroom costs approximately 1 000 1 500 to demo and install new floor tile and tub surround.
Apply it to the wall with the bottom edge about 1 4 in.
Make sure you shim any shallow areas before attaching the tub retaining clips to the studs.
How to install a tile tub surround pre caulking and waterproofing.
To tile around a tub or shower start by measuring the height of the back wall from the lip of.
The best approach when installing cement board or other tile backer around a tub is to keep the cement board out of the lip area.
Mark the layout lines.
Use a wet saw with a diamond blade to cut all the tiles.
Prep the shower area for tile layout to start tiling prepare by running a bead of silicone caulk around the perimeter of the area you are tiling to seal it image 1.
How to tile a tub surround 1.
Cost to install tile the average 5 ft.
Secure the top of the wall to the studs with screws.
Use the back of a plastic spoon to smooth the caulk.
Fill the gap between the tile and the tub with caulk.
Start at the intersection of the two layout lines and spread a thick layer of tile mastic.
A stand up shower needs twice as much tile which will add on another 2 000 3 000.
Test fit the tub and use shims to achieve a level condition within 1 32.
Tub surrounds can sometimes be installed over existing tile but only when conditions are right.
This video will show you how to set tile around a tub.
Start installing the.
Level and plumb lines.
Above the lip of the tub.
Trowel on the tile mastic.
If the tub is level start with a full tile at its rim.
Follow the order shown in the diagram to snap the rest of the lines.